Sheardown Poultry Farm
Poultry

Sheardown Poultry Farm

Client

Mr James Sheardown

Location

Green Lane Farm, Orston, Nottinghamshire

Design & Construction 380ft x 66ft Broiler Poultry Unit together with refurbishment of existing shed. This scheme comprised the construction of a clear span steel framed poultry building together with infrastructure works, service buildings and attenuation ponds.

Clear Span

Housing 48,000 (max stock density) birds per crop cycle.

Ventilation

Offset ridge and side ventilation optimising the bird environment.

Hygiene

Gradient slabs, polyester flat sheet cladding and wash out diverter facilities.

Airtightness

Pressure and smoke tested building achieving the design brief.

U Values

Minimum heat loss and reduced building running costs due to efficient design.

Refurbishment

Full refurbishment of exisiting poultry shed to suit the requirements of the market.

Design

  • Fully designed by experienced team (in house)
  • Proven clear span design adapted to ensure efficiency of construction
  • Exacting requirements incorporated to meet the customers needs

Construction

  • Competent site management ensuring the project was delivered to suit the clients key dates
  • Incorporation of our off-site manufactured timber framed panel system bringing both programme and cost benefits.
  • Proactive and excellent Health & Safety Management resulting in no reportable accidents.

‍