Crumbs Café – Heritage Restoration
Thanks to a Grant from the Boston Townscape Heritage Project, Clarke Group Construction Ltd were employed by the owner of Crumbs Café (6-8 Dolphin Lane) to regenerate the building and carry out [...]
Thanks to a Grant from the Boston Townscape Heritage Project, Clarke Group Construction Ltd were employed by the owner of Crumbs Café (6-8 Dolphin Lane) to regenerate the building and carry out [...]
We are well underway with works at the church in Manthorpe near Grantham. The entrance door to the church has been reinvigorated and new Ancaster Stone slabs installed. The new slabs have been [...]
Clarke Group are currently in the process of constructing a large, new office block for a manufacturing facility in the Grantham area. The office block, measuring 220m2, will add a variety of [...]
We have recently handed over our second property at the lovely cul-de-sac Clarke Close in Quadring. A fantastic four-bedroom family home with the perfect balance of space for family living, with [...]
Clarke Group have recently welcomed Tom Jackson (as shown in the picture above) to the team taking up the role of Working Foreman. Tom will be taking over the running of the fantastic project [...]
Paul Clarke (Director), Tom Simpson (Commercial Manager) & Steve Melton (Assistant Contracts Manager) donned their finest attire on Thursday 19th September for this year’s British Poultry [...]
Clarke Group have had a fantastic year in 2019 so far with an order book to be proud of for 2020. Having welcomed a number of new team members over the last few months; taking up positions in [...]
Clarke Group are thrilled to have been awarded this eagerly anticipated project at the church of St John the Evangelist in Manthorpe near Grantham! Clarke Group have been appointed as the main [...]
Clarke Group have recently completed a 3-bed bungalow in Wiltshire to be occupied by a farm manager in the poultry sector. The dwelling is one of a number Clarke Group have constructed for this [...]
Clarke Group have recently completed a fantastic shop front refurbishment at Hoppers Jewellers in the High Street, Boston, taking just 8 weeks to complete. The works included removal of the [...]